Welcome to Jingmao Tong (Shandong) Metal Products Co., Ltd.
Email :business@sdhmsteel.com Whatsapp :+8613176025308
PRODUCT CENTER
42CrMo hot rolled steel sheet/bar
Product Details
Product introduction
42CrMo4 is a steel for quenching and tempering, which has a good combination of strength and toughness in the quenched and tempered condition. After the oil quenching, the steel will be through hardened up to ø60 mm bar diameter. The microstructure of larger dimensions is not fully martensite. The steel is applicable to induction hardening. The surface hardness will exceed min. 53 HRC. 42CrMo4 can be delivered M-treated in order to optimize the machinability.
Technical data
| Chemical Composition | ||||||||
| Steel Grade | C | Si | Mn | P | S | Cr | Mo | Cu |
| 35CrMo | 0.38~0.45% | 0.17~0.37% | 0.50~0.80% | ≤0.035% | ≤0.035% | 0.90~1.20% | 0.15~0.25% | ≤0.30% |
Mechanical properties
| Yield strength σs/MPa (>=) | Tensile strength σb/MPa (>=) | Elongation δ5/% (>=) |
Reduction of area ψ/% (>=) |
Impact absorbing energy Aku2/J (>=) | Hardness HBS 100/3000 max |
| ≥930(95) | ≥1080(110) | ≥12 | ≥45 | ≥78(8) | ≤217HB |
In order to increase the die life to more than 800,000 die times, the pre-hardened steel can be hardened by quenching and low temperature tempering. When quenching, preheat at 500-600℃ for 2-4 hours, and then keep it at 850-880℃ for a certain period of time (at least 2 hours), then put it in oil and cool to 50-100℃ and air cooling, the hardness can reach 50 after quenching -52HRC, in order to prevent cracking, 200℃ low temperature tempering treatment should be carried out immediately. After tempering, the hardness can be maintained above 48HRC.
42CrMo Steel Heat Treatment
Annealing
Annealing in 760±10℃, furnace cooling to 400℃ then air cooling.
Normalizing
Normalizing in 760±10℃, air cooling after out of the furnace.
Notes About Quenching and Tempering Treatment
Must pay attention to the temperature of liquid coolant. And must make sure there are no oil contamination or other impurities. Otherwise, the hardness of steel will be not enough or out of the balance.
Quenching and tempering for billet steel material without processing, then it will get non-uniform hardness. So processing of forging or grinding is necessary before the Q+T.

Factory profile
Adhering to the tenet of "integrity first, quality for survival", the company has established a complete marketing channel of "based in North China, radiating the whole country, and facing the world", and has not only established a solid strategic partnership with many domestic and foreign enterprises.We have been committed to product development, production and sales, after more than ten years of efforts, our products have been widely used in various fields.

Packing method: Packing according to customer's requirement.
The company has more than 110,000 square meters of production and processing base, fully introduced the international advanced modern automatic production and processing equipment, and took the lead in passing the ISO9001, TS16949, BV, SGS and other international well-known institutions certification.The products are mainly exported to Italy, Mexico, South Korea, Israel, Turkey, India, Pakistan, Kyrgyzstan, Oman, Kazakhstan, Vietnam, Myanmar and other countries. The company's supply is sufficient, the variety is complete, order production is fast, welcome domestic and foreign manufacturers, traders to contact us.

Company Advantages
1. We are a large-scale production enterprise integrating production, research and development, and can customize the products required by customers.
2. We have a perfect after-sales service system, which can track the problems encountered by customers in production at any time and provide corresponding technical support, so as to share our high-quality resources with customers.
3. After more than ten years of development, the company has complete product varieties and large inventory, which can be delivered in the shortest time.
4. Free samples are available.
5. With obvious price advantage, the company has complete production process, from raw materials to finished products integrated production can maximize the cost savings.
QUESTIONS AND ANSWERS
1. Can you make a discount on your price?
2. Do you have any compensation if the goods do not arrive on time?
3. Can I add my own Logo to the purchased products?
4. Can you compensate for the damage in transit?
APPLICATION FIELD
Steel Structure
Steel Structure
Petroleum
Petroleum
Boiler
Boiler
Architecture
Architecture
A Ship
A Ship
Bridge
Bridge
Chemical Plant
Chemical Plant
Oceanographic Engineering
Oceanographic Engineering
RELATED PRODUCTS
GET A FREE QUOTE